Built for every allied trade - not just the main contractor.
General contractors and specialist trade contractors run the same deep ERP - with BOQ, rate analysis, procurement and billing tuned to how each discipline actually works, in ₹ or AED.
Civil & structural
RCC, earthwork, roads, bridges and structures - SOR-driven BOQ, scheduled rate analysis and running-account billing for long projects.
MEP
Mechanical, electrical and plumbing packages with heavy subcontracting - work orders, measurement and material reconciliation against issued stock.
HVAC
Chillers, AHUs, ducting and controls - equipment procurement, installation tracking and commissioning, with depreciation on owned plant.
Fire protection
Firefighting systems - pumps, FACP, sprinklers and detection - with itemised BOQ, certification milestones and stage-wise billing.
Electrical
LV/HV distribution, panels and cabling - material-heavy BOQ with lot tracking, rate contracts and price-variance control on cable and switchgear.
Plumbing
Water supply, drainage and sanitary - BOQ to delivery with vendor comparatives on fixtures and pipe, and material reconciliation on site.
Interiors & fit-out
Joinery, flooring and finishes - fast-moving procurement, quick orders and tight cost control on short-cycle, high-churn fit-out jobs.
EPC
Engineer-procure-construct turnkey - the full lifecycle on one job, from preconstruction through procurement, execution and combined billing.
Facilities management
Operations & maintenance contracts - preventive schedules, service work orders, asset registers and recurring billing for the post-handover phase.
Oil & gas
Piping, tankage and process packages - long-lead procurement, expediting, weld and test tracking, with milestone billing on large EPC scopes.
PEB manufacturing
Pre-engineered buildings - steel fabrication BOM, shop-floor production tracking, erection scheduling and dispatch-to-site billing.
Catering services
Site and camp catering - menu costing, headcount-based provisioning, kitchen stores and recurring per-meal or contract billing.
Every trade. Both markets. One ERP.
Whether you're an Indian civil contractor billing in ₹ under GST, or a Gulf MEP and fire contractor billing in AED under VAT - ProjectsNext runs both, side by side.
Book a demo for your trade